Customer |
Description |
Year |
D company |
Australia Gasification Test Facility: Construction, commissioning, operation and maintenance support services |
2020 |
J organization |
Renewal of water quality improvement equipment |
2019 |
D company |
Australia Gasification Test Facility: Design, procurement, and construction support services |
2019 |
J organization |
Renewal of RCS cooling water system |
2018 |
D company |
Australia Gasification Test Facility: Design support services |
2018 |
Q organization |
Periodic inspection of radioactive waste treatment facilities |
2016 |
D company |
Malaysia: Instrumentation design and site management services |
2015 |
J organization |
Periodic inspection of radioactive waste treatment facilities |
2012 |
J organization |
Periodic inspection of secondary cooling equipment at ion irradiation research facility |
2011 |
J organization |
Periodic inspection of radioactive waste treatment facilities |
2011 |
N company |
Preparation of basic design documents for detoxification treatment facilities |
2010 |
J organization |
Periodic inspection of radioactive waste treatment facilities |
2010 |
J organization |
Periodic inspection of irradiation facility secondary cooling equipment |
2009 |
J organization |
Cement solidification equipment inverter renewal work |
2009 |
J organization |
Periodic inspection of radioactive waste treatment facilities |
2009 |
T company |
Fire hydrant piping rehabilitation design |
2009 |
T company |
Design of piping retrofit for outdoor fire hydrants |
2008 |
J organization |
Periodic inspection of irradiation facility secondary cooling equipment |
2008 |
J company |
Design for new anhydrous production facility |
2008 |
J organization |
Periodic inspection of radioactive waste treatment facilities |
2008 |
D research institute |
Relocation of power supply, power panel, etc. |
2007 |
E company |
Feasibility studies and technical assistance for environmental projects |
2007 |
J organization |
Periodic inspection of irradiation facility secondary cooling equipment |
2007 |
J organization |
Cooling water pipe wall thickness measurement |
2007 |
T company |
Supercritical Water Gasification System: Examination of gas engine waste heat recovery and feasibility study |
2007 |
J company |
Support design of furnace system using high-temperature waste heat |
2007 |
J organization |
Periodic inspection of radioactive waste treatment facilities |
2007 |
J company |
Installation of raw material mixing equipment |
2007 |
J organization |
Delivery of metal tube type area flowmeter |
2007 |
E company |
Preparation of preliminary environmental assessment sheet for refining plant |
2006 |
D research institute |
Design and fabrication of chemical influence test equipment |
2006 |
J organization |
Periodic inspection of irradiation facility secondary cooling equipment |
2006 |
J organization |
Coolant pump repair |
2006 |
D company |
Disassembly equipment central monitoring system design |
2006 |
I company |
Support work for construction of ethylene equipment control system |
2006 |
E company |
Assistance in developing a basic design for the relocation of RI research facilities |
2006 |
T company |
Maintenance of piping test facilities and comprehensive load testing |
2006 |
T company |
Basic design of supercritical water gasification system |
2006 |
J organization |
Periodic inspection of radioactive waste treatment facilities |
2006 |
J company |
Hydrogen supply system performance test operations |
2006 |
J research institute |
Periodic inspection of irradiation facility secondary cooling equipment |
2005 |
J company |
Hydrogen supply system test plant equipment installation piping and wiring work |
2005 |
J research institute |
Renewal of cooling water system |
2005 |
J research institute |
Periodic inspection of radioactive waste treatment facilities |
2005 |
J research institute |
Non-sound system circulation pump overhaul and inspection work |
2004 |
J research institute |
Repair of sprinkler pump for secondary cooling tower |
2004 |
J research institute |
Adjustment of cooling system equipment |
2004 |
J research institute |
Repair of pure water pump for ion source injection system |
2004 |
J research institute |
Inspection and adjustment of inverters for irradiation facility cooling towers |
2004 |
J research institute |
Periodic inspection of irradiation facility secondary cooling equipment |
2004 |
J company |
Reformed hydrogen supply system Mechanical design work |
2004 |
J research institute |
Periodic inspection of waste treatment facilities |
2004 |
T company |
Thermal-hydraulic analysis of storage building heat removal performance |
2003 |
T company |
Renewal of lighting at Lorry Filling Station No. 2 |
2003 |
J research institute |
Multi-purpose ultra-high vacuum chamber |
2003 |
J research institute |
Periodic inspection of irradiation facility secondary cooling equipment |
2003 |
J research institute |
Inspection and maintenance of accelerator cooling system |
2003 |
T company |
Airflow analysis trial calculation for facilities |
2003 |
J research institute |
Pure water cooling pump repair |
2003 |
T company |
Transportation Support Systems: Transportation Operations Analysis Study |
2003 |
J organization |
Dewatering unit repair work |
2003 |
J research institute |
Periodic inspection of waste treatment facilities |
2003 |
J research institute |
Extension of building house large laboratory cooling water system remodeling |
2003 |
J research institute |
Periodic inspection of irradiation facility secondary cooling equipment |
2002 |
I company |
Trial operations for current status and analysis of business processes |
2002 |
J research institute |
Production of internal parts for positron generation chamber |
2002 |
J research institute |
Installation of electrical wiring and cooling water piping to the laser charge conversion experimental apparatus |
2002 |
J research institute |
Periodic inspection of waste treatment facilities |
2002 |
I company |
FS to increase capacity of atmospheric distillation unit at refinery |
2002 |
I company |
Technical study on FS for refinery modernization |
2002 |
J organization |
Purchase of a moving camera for process room monitoring |
2001 |
P company |
Manufacturing and installation of pumps for transporting wastewater from facilities |
2001 |
J organization |
Advanced Operation Optimization System Construction |
2001 |
I company |
FS study related to capacity expansion of atmospheric distillation unit at refinery |
2001 |
J organization |
F-tower sizer assembly line work |
2001 |
J research institute |
Periodic inspection of irradiation facility secondary cooling equipment |
2001 |
J company |
Risk Management for Product Supply |
2001 |
T company |
Smelting project Off-site process design |
2001 |
I company |
FS study related to capacity expansion of atmospheric distillation unit at refinery |
2001 |
J organization |
Continuous distillation test apparatus repair work |
2001 |
J organization |
Process analysis work for advanced process operation control |
2001 |
I company |
Lubricant distillation unit Examination of oil types outside design |
2001 |
J organization |
Production of emergency monitoring system |
2001 |
J research institute |
Periodic inspection of waste treatment facilities |
2001 |
T company |
Renewal of cell ventilation system ducts Electrical and instrumentation work |
2001 |
T company |
Glove box alarm panel fabrication and installation |
2001 |
T company |
Safety Analysis Code Study and Report |
2001 |
J research institute |
Production and installation of cooling water subheaders for electromagnets |
2001 |
J research institute |
Cavity mounting equipment fabrication |
2001 |
I company |
Study of modification of reduced-pressure distillation unit at refinery |
2000 |
T company |
Low-level waste management facility design |
2000 |
J research institute |
Radioactive wastewater treatment facility Renewal of control instruments |
2000 |
J research institute |
Periodic inspection of irradiation facility secondary cooling equipment |
2000 |
I company |
Basic design for modification of lubricating oil hydrogenation equipment |
2000 |
J research institute |
Renewal of waste treatment facility cement solidification equipment |
2000 |
J research institute |
Cooling tower H504 sprinkler pump renewal work |
2000 |
J research institute |
D Accelerator facility Preliminary study of cooling water system |
2000 |