Customer |
Description |
Year |
S research institute |
DAC process simulation and cost evaluation calculation |
2021 |
I company |
Heat exchanger heat transfer design |
2021 |
J association |
Process Simulation and Cost Estimation of Synthetic Liquid Fuel Generation |
2021 |
M company |
Ammonia abatement facility study |
2021 |
T university |
Fully Mixed Curtain Separation Model |
2021 |
N university |
Research and Development of Highly Efficient Oxygen Concentration Technology |
2021 |
D company |
Model setup for Aspen Online for simulation model development |
2020 |
S research institute |
Gasification modeling services |
2020 |
P company |
Equipment cost estimation services |
2020 |
U company |
Paramylon Ester Synthesis Design of Recovery Distillation System for Waste Liquid |
2020 |
J company |
COG Refinery Facility Simulation Model |
2020 |
K company |
Simplified study of amine atmospheric pressure regeneration |
2020 |
J organization |
Study of Hydrogen Separation and Recovery System |
2020 |
T company |
Heat exchanger design work |
2019 |
J organization |
Study of renewal of cooling water facilities at transportation facilities |
2019 |
H company |
Thermal stress calculation/analysis work |
2019 |
H company |
Methanol synthesis workflow construction and flow calculation |
2019 |
O company |
LNG Lorry Shipping Facility Process Study |
2019 |
H company |
Plastic Gasification Process Simulation Model Building |
2018 |
J organization |
Analytical modeling of propellant generation and hydrogen liquefaction facilities on the lunar surface |
2018 |
D company |
Australia gasification facility: Gasification simulation services |
2018 |
J company |
Basic design contract work for production facilities |
2018 |
A company |
Support for electrolyzer dynamic model construction |
2018 |
E company |
Safety valve sizing operations |
2018 |
E company |
Heat balance simulation study for plant design |
2018 |
H company |
CO2 conversion model case study work |
2017 |
N company |
Hydrogen Filling Dynamic Simulation Analysis |
2017 |
S company |
Conceptual design work for ammonia and lithium processes |
2017 |
N company |
Operator Training Simulator |
2017 |
H company |
Methanol Synthesis Model Building Work |
2017 |
A company |
Analysis of a small LNG vaporization heat exchanger |
2017 |
H company |
CO2 conversion model building assistance services |
2017 |
K company |
Cost estimation of carbon dioxide absorption process |
2016 |
D research institute |
Iodine chemistry modeling |
2016 |
H company |
CO2 conversion process modeling work |
2016 |
I company |
FS Support Services for Australian Lignite Gasification Test Facility |
2016 |
N company |
LPG physical properties calculation simulation work |
2016 |
I company |
Cost comparison of carbon dioxide absorption processes |
2015 |
M company |
Methane hydrate riser pipe modeling work |
2015 |
W university |
Support for modeling high temperature properties of absorbent solutions |
2015 |
H company |
Biomass gasification power generation facility simulation work |
2015 |
J company |
Design work for adsorption column for gas purification |
2015 |
R organization |
Process simulation calculation work related to CO2 capture |
2014 |
S company |
Heat exchanger process design |
2014 |
O university |
Basic plant design for gasification and multi-stage catalytic conversion process of waste biomass |
2014 |
Y company |
Hysys Dynamics model building for OTS |
2014 |
T company |
Seismic evaluation of equipment foundation bolts |
2014 |
T university |
Simulation study work for test equipment analysis of ammonia absorption chillers |
2013 |
D company |
Simulation work for CO2 capture IGFC system |
2013 |
R organization |
CO2 Capture Energy Minimization Study Work |
2013 |
D company |
Study work on IGCC process simulator |
2013 |
K company |
Creation of physical property data for carbon dioxide absorption liquids |
2013 |
M company |
Terephthalic acid basic design function improvement Input work |
2013 |
S company |
Design of local heat transfer test equipment |
2013 |
H company |
Cost Estimation for Bioethanol Plant |
2013 |
P company |
Refining Business Basic Design |
2013 |
D company |
Simulation work related to coal gasification fuel cell combined cycle power generation system |
2012 |
R organization |
Case study work on chemical absorption process with process simulation |
2012 |
R organization |
Process simulation work for CO2 separation and recovery technology for new chemical absorbents |
2012 |
M company |
Material flow model construction |
2012 |
S company |
CMM Enrichment Facility Process Study |
2012 |
S company |
Heat exchanger design |
2012 |
R organization |
Chemical absorption process analysis work by process simulation |
2011 |
H university |
Design of light oil desulfurization process |
2011 |
J organization |
Creation of Exhaust Ventilation Control System (Sequencer) |
2011 |
H company |
Fuel Cell Modeling Services |
2010 |
D research institute |
Research equipment design |
2010 |
R organization |
Pilot plant test equipment specification review work |
2009 |
T company |
Methane gas fermentation equipment P&ID and layout study work |
2008 |
N company |
Process Analysis of Fuel Cell Systems with Aspen Plus |
2008 |
J company |
Simulation of corrosive environment for 2TP equipment |
2001 |
J organization |
Building Process Models |
2000 |
T company |
Conceptual design of a reprocessing waste treatment facility |
2000 |
J organization |
Modification work and modeling of continuous distillation test apparatus |
2000 |